Homasote spline installed at the new location for Ivy, VA. The siding on the aisle side is the Westvaco Pulpwood location. The siding into the backdrop is for the grocery warehouse located away from the mainline. Since the building is not visible from the mainline, it will not be modeled, but the hidden siding will hold about 3 boxcars.
Showing posts with label Ivy. Show all posts
Showing posts with label Ivy. Show all posts
Sunday, February 17, 2013
Friday, August 10, 2012
More...
Here in the lower level is Ivy, VA. There we have the Westvaco Pulpwood loading and a grocery warehouse siding. Upper level will be Fishersville with a small grain siding.

Progress pics
New peninsula under construction. Upper deck will be close to Fishersville, VA and the lower deck is between Ivy, VA and Mechums Creek Bridge.

Subscribe to:
Posts (Atom)



